Indore

Indore Metro Progress: Safety check continues, final trial scheduled for month end

The Chief Minister will launch various development projects, including the double-decker bridge, on Sept 30.

Khushboo Ali

Indore has made substantial progress in bringing its eagerly anticipated metro system to life. The city's first-ever dynamic trial for the metro train was successfully completed on September 13. Subsequently, a safety check is being conducted currently.

The final trial is scheduled for month end, on September 30, coinciding with additional developmental initiatives.

The final trial is slated to be held by month end

The initial trial focused on practical aspects of train operations, including movement, stops, station timing and metro alarms. These were meticulously examined and discussed by officials.

Looking ahead to the final trial, this event will also mark the inauguration of the double-decker bridge at Lavkush crossing and other development projects, such as roads outlined in the master plan and an international swimming bridge.

Additionally, the chief minister will visit Gandhinagar for the metro trial, dedicating approximately two hours to this endeavour. In anticipation of the September 30 trial, Metro Corporation officials have expedited work at three stations adjacent to Gandhinagar, with the installation of escalators and the construction of station sheds advancing swiftly.

To get all the latest content, download our mobile application. Available for both iOS & Android devices. 

Diljit Dosanjh's Ekana Concert: Lucknow police issues traffic advisory

Ahmedabad News | Temp drops to 18.6°C, Riverfront roads to be closed on Sunday & more

This weekend in Ahmedabad: 7 new events you can’t miss!

Maharashtra Election Results | Mumbai Traffic Advisory issued for November 23— Plan your route

Ahmedabad News | IMD forecasts temp drop today, Lotus Park to be developed by AMC & more

SCROLL FOR NEXT