In a major infrastructure push, plans have been unveiled to extend Mumbai’s Coastal Road from Nariman Point to Virar in Palghar. This ambitious expansion, supported by a substantial ₹54,000 crore investment from the Japan Government, is set to slash travel time between these locations to just 30-45 minutes.
The project represents a transformative advancement in connectivity for the Mumbai Metropolitan Region (MMR), marking a major step forward in regional development.
This announcement comes as the Coastal Road Project makes substantial headway, with phase one—from Marine Lines to Kandivali—rapidly advancing. The first 10.58-km segment, running from Marine Drive to the Worli end of the Bandra-Worli Sea Link (BWSL), opened in March 2024, achieving a 70% reduction in travel time and a 34% decrease in fuel consumption.
A recent milestone was achieved with the successful installation of a 44-meter span that links the northbound road to the Worli Sea Link, marking significant progress in this transformative infrastructure effort.
The project also boasts ambitious features, including a parking facility for 1,857 vehicles and four underground parking areas in strategic locations around Worli and Breach Candy. Upon completion, a scenic 20-meter-wide promenade will extend along the coast, complete with biking paths, an open-air theatre, and various recreational amenities.
Extending the Coastal Road to Virar is anticipated to enhance regional infrastructure and stimulate economic growth, reshaping travel and leisure along Mumbai’s western coastline.
To get all the latest content, download our mobile application. Available for both iOS & Android devices.