Knocksense Shorts | Full-fledged Kanpur metro North-South corridor to be ready by 2025

Knocksense Shorts | Full-fledged Kanpur metro North-South corridor to be ready by 2025

The North-South Corridor will cater approximately 1.5 lakh commuters daily.
Published on
1 min read

The Uttar Pradesh Metro Rail Corporation (UPMRC) is all set to roll out the North-South corridor of Kanpur Metro in 2024-25. The said corridor will be rolled out in a full fledged manner by 2025, catering to nearly 1.5 lakh commuters on a daily basis.

It is noteworthy that the North-South corridor of Kanpur Metro will have a total of 21 stations, going from IIT Kanpur to Naubasta. Out of these 21 stations on the corridor, fourteen will be elevated and seven will be underground stations.

To get all the latest content, download our mobile application. Available for both iOS & Android devices. 

Knocksense
www.knocksense.com